Cheap heat for a million homes—pure rubbish, says City Hall
LONDON’s rubbish could be used to generate electricity for up to two million homes, a City Hall report out today estimates. We produce 22 million tonnes of waste a year, enough to fill Canary Wharf Tower every eight days, or heat up to 625,000 homes.
LONDON's rubbish could be used to generate electricity for up to two million homes, a City Hall report out today estimates.
We produce 22 million tonnes of waste every year, enough to fill East London's iconic Canary Wharf Tower every eight days, or heat up to 625,000 homes.
Most of it is taken off and buried in landfill sites, which is no longer sustainable, the London Assembly's report Where There's Muck There's Brass points out.
It is time London had an alternative strategy such as 'waste energy' conversion, says the Assembly's environment committee.
You may also want to watch:
"London's waste manageme\nt is unsustainable and uneconomical," said environment chair Murad Qureshi. "Our recommendations are pragmatic and will contribute to a rapid rollout of these technologies that turn waste into a useful commodity."
But existing long-term contracts for treatment of municipal waste make it difficult for companies to get waste material, it warns.
Most Read
- 1 Teenager found dead in Victoria Park
- 2 Driver arrested after police 'drugs patrol' stops car in Whitechapel
- 3 Two in five people in Tower Hamlets may have had Covid-19
- 4 Students in rent strike over Queen Mary's campus staying open during Covid emergency
- 5 'Laptop bonanza' for schoolchildren in Poplar to help survive lockdown gloom
- 6 Leyton Orient sign Dan Kemp on a permanent deal from West Ham United
- 7 Drug and alcohol abuse by Tower Hamlets parents and children soars
- 8 That's so raven: Everything you need to know about the guardians of the Tower
- 9 Post deliveries in east London hit by Covid crisis among Royal Mail staff
- 10 'I can save the planet with my seaweed' scientist in east London claims
The report calls on the London Waste Recycling Board to provide details on all Town Hall contracts and to advise how to "generate waste streams" to supply new plants, which could also reduce London's CO2 emissions by 1.2 million tonnes.